Monster Factory Chapter 1002: : Unmanned


Of course ~

The improvement on the hardware is simple, and it is difficult for customer(s)s to fully experience the fun of power feedback glove software.

In Ye Qing's thinking, the power feedback glove is a "key" connecting virtual and reality.

Before the product is put on the market, not to mention the virtual part, at least let customers have a look at the realm of the leopard, the shocking corner of virtual reality.

A few weeks later, the Company product research and development department has made several improvements, and temporarily set the power feedback glove to version 1.0.

Power Feedback Glove 1.0, in addition to greatly improving the skin ventilation problem, it also especially strengthens the gesture capture function, adds a wear-resistant layer on the palm, and the appearance of the glove can be customized with new changes in děng děng|etc|wait.

There are also many changes in software. The biggest highlight is that it is compatible with cell phone and computer ports.

It can connect with cell phone computers currently on the market through Bluetooth.

The customer(s) uses it as a keyboard and mouse, or it is used to operate the cell phone from the air, and it is also very convenient.

In addition, after several weeks of hard work, Dragon Creek Beach Factory has finally built the virtual Factory5.0.

Ye Qing is now in the Swift Thunder car production center of Factory.

The Swift Thunder production center can be regarded as the one with the largest changes in all the factories in Factory.

Before the transformation, more than one hundred monsters worker were needed here.

But this worker number is already considered a miracle in the automobile production bases of various countries.

Even the Volkswagen production line in Wolfsburg, which claims to have the highest degree of automation, cannot control the position worker to one-third of this proportion.

Ye Qing and Electric Crystal walked along the steel escalator to the top floor of the production center, overlooking the entire production center from top to bottom.

Before the transformation, Ye Qing often came here, knowing the placement of every important industrial device.

After the transformation, Ye Qing observed for a while, and felt that there was not much change here, but also that it had changed a lot.

For example, in Ye Qing's vision, there seem to be hundreds of pure white "incubators" in an endless stream.

These are "weapons of mass destruction" in the automotive industry.

Each "incubator" integrates multiple sets of precision mechanical arms no less than Five-axis Processing Center precision. The frame of the Swift Thunder car will be automatically sent into the "incubator", and then the various parts required by the Swift Thunder car will be quickly and accurately installed on the frame by the robotic arm.

From windshield wipers, to the center console in the car, to the steering wheel, all small-sized car parts can be automatically installed here.

The location of the hundreds of devices that Ye Qing remembers most has not changed, but the device auxiliary device has changed a lot.

Although these devices were originally highly automated, drilling, reaming, welding, and precise marking can be completed in a blink of an eye. At the same time, the mechanical arm grips the parts needed by the car and fixes them on the frame in an orderly manner.

But these parts are not fully automatic. The auto parts used in hundreds of "incubators" are concentrated in the parts supply workshop farther away through the transmission track.

In the parts supply workshop, several monsters worker from 20 need to be occupied. They have to control a special fixture device to move hundreds of parts of the same model onto the track at a time.

Now there is no one in the parts supply workshop. Parts are not picked up by fixtures, and hundreds of them are picked up at a time.

It has been transformed into a magazine structure, and each component is loaded into the track one by one like a bullet.

Going back to the Warehouse of parts, the process of sorting and importing parts into the parts box is also completed by fully automatic machinery.

Finally, the parts magazine is accurately advanced into the device. Whenever the parts in a parts magazine are used up, there will be a manipulator to take out the parts magazine and put it into the rail car for the next loading and exporting cycle.

It's easy to say, how difficult is it to do this?

At the beginning of the establishment of the Swift Thunder production center, the monsters produced energy "incubators", but there was no good way to solve the problem of fully automated parts supply.

This is not a problem that can be solved by tailoring a set of parts sorting and supplying machines.

Unmanned, it means that the entire parts sorting and supply step must be Five-axis Processing Center, which is not bad on precision.

When parts are moving, they will vibrate. When put down, the same will happen.

A robot arm or a fixture will also produce errors during the work process. These errors will become larger and larger with each repeated positioning of the guide rail

To correct the errors, monsters worker have to correct these device at high frequency. But once device enters the correction mode, it will stop work and delay production.

This is an unsolvable technical difficulty.

The appearance of the virtual Factory5.0 replaced the part of the monsters worker to revise device.

sensor will automatically record every working data of device, and the virtual Factory will automatically analyze whether there is an error based on these data. If it does, it will take over the device drivers of this device and let it automatically correct the error the next time it works.

This is the case for one set of parts to be disassembled and supplied to device, as is the case for one hundred Swift Thunder "incubators".

This is true for all devices in an Swift Thunder production center, and the same is true for the entire Dragon Creek Beach Factory.

"I remember watching a science fiction movie that year, and the robot in it produced Factory just like ours." Ye Qing's eyes were piercing, and he was full of pride.

"Can I ask the name of the movie?" Electric Crystal~IndoMTL.com~, who hosts the virtual Factory5.0 project, is also very proud.

"The Terminator."

"I've seen it, but it's blown too much inside." Electric Crystal curled its lips secretly, "There can't even be built a spaceship, and dare to brag about building a time machine?"

"Then you said that time machine can be created?" Ye Qing asked with a smile.

It doesn't matter if the movie is bragging or not.

Ye Qing can only say that the current Monster industry has achieved that human beings rely on the current level of industrial technology to imagine the limit of imagination of the future Factory. Even the robot Factory in the Terminator is not as advanced as the Dragon Creek Beach.

Look at how the robot protective armor inside was made, and it was actually molded from a metal furnace.

To change to Monster industry, it must be the injection sand mold technology, print out the mold, and then powder metallurgy is integrated.

Fully automated, full of style.

"Boss, don't think about it." Electric Crystal shook his head, "The time machine is a false proposition. Don't talk about us, the aliens would never want to make it."

"It doesn't matter if I can't make it. Isn't it a mess to make the world line? If someone goes back in time and leads me as a child astray, where can I go to reason?"

Ye Qing patted Electric Crystal on the shoulder, "Go ~ and we will visit the next plant."

With the departure of Ye Qing and Electric Crystal, the Swift Thunder production center also started the first production after the transformation.

A hundred "incubators" started at the same time, and the device indicator lights of all production links were also lit up almost at the same moment.

There is no shadow of the monster worker.

Here has dropped sharply from over a hundred worker at the beginning to ten now.

Five Master Craftsman, two hard laborers, and three Electronic Envoy.

This is a hardware maintenance team. Their job is to overhaul and maintain the hardware.

After all, this job cannot be replaced by a virtual Factory.


Leave a Reply