Desperate Mobile Game Chapter 164: Skills industry has specialization


The level of the workers laying the floor tiles, the mastermind’s assessment cannot be cheated. While laying, the mastermind will check the flatness and **** of the floor tiles, the density of the cement, sand, and water under the floor tiles, etc. Assessment and evaluation, and then give a specific rating result, whether it is E level, D level, or C level, B level, etc. --

Know that in this entire base, Cao Chengyu is the person with the highest level of floor tiles. He has already reached the D-level peak, and almost touched the C-level threshold, but he has been stuck in the bottleneck. Break through the'fine' progress.

Unexpectedly, this ‘Mao’ head guy said that the C-level workers he laid the floor tiles were okay! Cao Chengyu suddenly felt unbearable.

"I haven't started shop yet, how do you know that I'm not good? Forget it, I'm disappointed, I'll go somewhere else to find something to do." Jin Ke turned to leave.

"Try to shop two pieces here. If you can really reach the grade C rating, I will pay you 50 per brick!" Foreman Chu Xinfeng quickly stopped Jin Ke, his mission here It was Shou Jin Ke and Jin Ke hook. If Jin Ke ran away, how could he'confess' to Li Liang and Luo Shatian?

"Okay, give it a try." Jin Ke came here to dig the corpse claws and worm sacs, but he abandoned his original plan after suspecting it was a trap from Rakshasa.

If you can make 50 contribution points for laying a brick, you won’t make money if you have money. And what he lacks most now is contribution points.

"Wait! Let's say yes, if your floor tiles do not meet the C-level rating, you have to not take a contribution point, and all the floor tiles in this dormitory area are laid out! Not up to the standard is not allowed Leave." Foreman Chu Xinfeng immediately put forward supplementary conditions to Jin Ke.

Chu Xinfeng must complete the task Li Liang's "account" for. If Jin Ke leaves because of low pay, he will not be able to do this task. Now Chu Xinfeng has to do everything possible to keep Jin Ke first. As long as he keeps Jin Ke laying the floor tiles here, he will take everyone on the scene away, allowing Jin Ke to "have a chance" to find the weapons and worm sacs he has buried. Then he can get all the stolen goods.

As for the remuneration for laying the floor tiles... Can this ‘mao’ guy really reach the C grade for evaluation? Pull the calf! Foreman Chu Xinfeng is a senior construction worker himself, and he knows how difficult it is to lay the floor tiles to reach C level. And as long as you get the money from Jin Keren, you can count on the amount of contribution points promised to him, and then you can let Luo Shatian force him to come back.

"I'm all alone? Okay!" Jin Ke made a preliminary estimate. The floor tiles in the entire No. 23 dormitory area are less than 1,000, right? With 50 contribution points and a brick, you can earn more than 50,000 contribution points in total!

"It's useless to say, I think you can sign a contract!" Worker Cao Chengyu watching the excitement next to him is not too big a problem.

"Yes! To sign a contract, you must lay all the floor tiles before you can leave." Foreman Chu Xinfeng felt that Cao Chengyu's statement made sense, and quickly added a few words to Jin Ke.

"Before signing the contract, I want to try a floor tile. After all, it hasn't been paved for a long time, and my hands have been born." Jin Ke pointed out to the foreman Chu Xinfeng.

"No problem." Of course, foreman Chu Xinfeng would not believe that after Jin Ke tried a floor tile, his level could be improved by leaps and bounds to C level.

Jin Ke wanted to try a brick, not because his hands were born... He hadn't laid any floor tiles before. He did this because he wanted to start the plug-in to help him when laying the floor tiles. The plug-in cannot be started during the process, maybe there is no plug-in for this aspect in the Xiaomi mobile phone. Jin Ke did not have the diamonds, so naturally he would not take on the porcelain work.

But if the plug-in is activated, Jin Ke will of course take this opportunity to make a small fortune and collect enough money to send the heart’s ‘door’ ticket.

After the foreman Chu Xinfeng agreed, Jin Ke brought a floor tile and spread it on the ground with cement and sand.

After the construction department entered the site, in the early stage, personnel had been arranged to chisel up all the original floor tiles on the floor of No. 23 dormitory area, and plan to re-lay them with new unified floor tiles, so Jin Ke now only needs to place the floor tiles in front of him. The open space is ready.

More workers from the Construction Department gathered. Hearing that Jin Ke claimed to be able to lay the high-standard floor tiles of C-level workers, he immediately pointed to Jin Ke.

"This newcomer is really ignorant!"

"Yes! He has a specialization in the art industry, maybe he is good at other areas, but the craft of paving tiles, without practicing for ten or eight years, will not reach the D level."

"He said he had a C-level shop!"

"Bullshit? Look at his clumsy look, novice, right? C-level? I think E-level is choking!"

"It's so funny! Do you think he is laying tiles? The children play house?"

"..."

The crowd onlookers quickly realized that Jin Ke was a layman, and he was the kind of layman who couldn't pretend, like the performance they had when they first started in this business, and even worse.

People like this dare to claim to be able to lay C-level floor tiles. They simply don't take them as experienced workers!

As everyone laughed, Jin Ke smeared a puddle of cement mortar on the floor, then moved a floor tile with a length of one meter and two in width, tried to spread it on the ground, and waited for the external hanger to open.

"Drunk! Do not pour the ground or soak the floor before laying the floor tiles."

"Cement and sandstone examples can be adjusted at will..."

"No level meter or level ruler, it's all done by hand, cow fork!"

"C-level masters are different!"

"..."

The workers onlookers saw Jin Ke's ‘fuck’ by such a layman, their cynicism became louder.

The specifications of the floor tiles in the game world are not the same as those in the real world~IndoMTL.com~The floor tiles in the real world are generally 0.8 meters by 0.8 meters in size, and the smaller ones are 0.6 meters by 0.6 meters, and 0.3 meters by 0.3 meters. Now, the floor tiles that Jin Ke is laying in the game world are 1.2 meters by 1.2 meters. Regardless of the length and width, the large floor tiles in the real world are 50% more difficult, but the difficulty of laying is much greater. Times!

Although the floor tiles in the real world are much larger, the firing process is different. The floor tiles in the game world are relatively light. The 1.2-meter by 1.2-meter floor tiles weigh only 0.8 meters by 0.8 meters in the real world. Two thirds of the floor tiles. With Jin Ke's strength now trained to about 10 o'clock, it is not a big problem to move the floor tiles. The more troublesome thing is how to pave the floor tiles to a level and neatly.

In the real world, Jin Ke, who has no experience in this area, can only rely on his own imagination to be busy there.

The next step is to wait for the tile-laying plug-in to be activated and activate itself.

After the plug-in is activated, Jin Ke will sign a paving contract with the foreman Chu Xinfeng.

The seventh more! Today Monday, ask for a recommendation ticket! Ask for a monthly pass! There will be updates at midnight tonight!


Leave a Reply