Monster Factory Chapter 842: : When construction is in progress


The neighborhood of Friedrichstraße is very lively.

In front of the Monster industrial fleet, there is an open space isolated by white construction of a separation wall. Now Berlin urban health workers are demolishing this part of the wall.

The original old building has been demolished and removed, leaving some gravel and reinforced concrete pile foundations buried in the ground. According to the normal programming, if you want to build a new building on this land, you must first clean up the original concrete pile foundation structure, and then re-drive the pile foundation or concrete frame according to the construction drawings of the new building.

This step alone will take seven days at the earliest.

Now this street is crowded with pedestrians. On the opposite side of Friedrichstraße, this street coffee shop, or a place that can provide guests with leisure, is reserved by curious citizens.

They greeted their familiar friends and teased Monster's next possible performance.

Even these media reporters lost their interview cars one by one and ran to the window position on the third floor of second floor across the street, set up the photography device, and drank coffee leisurely while waiting for the performance of Monster industry.

"Hey fellow, do you reporter believe that this Company from China can build the flagship store in one day?"

"Not even a foolish monkey will believe it."

"Then you still set up so many interviews device..."

"Satisfy the curiosity of those citizens who are too late to watch the excitement."

This reporter is sipping his coffee at ease. Opposite the window, the Monster industrial fleet has already entered the construction site, but it seems that the employees of Monster industrial do not seem to be anxious at all.

They ordered several hundred cups of steaming take-out coffee from the four coffee shops across the street. The workers in orange uniforms each received a cup of coffee and drank it with a smile. A pile of plastic anti-collision boxes were moved out of the luggage layer of the bus.

Most of them don’t know the device instruments in the plastic boxes, but based on the operation of these employees, these instruments should be of the detection and detection category.

They used instruments to measure back and forth on the land belonging to the Monster industry. There were a few technicians on the side of the truck sitting in front of a folding table full of laptop computers, and from time to time they issued orders to those inspectors through walkie-talkies.

Time goes by little by little.

From the initial mentality of watching jokes, the people watching by the side have developed a mentality that it is better to go back to work than they feel bored. Two hours have passed.

For these two hours, the group of China people on the opposite site have been testing.

I took the instrument to detect every inch of this thousands of square meters of land, and even with the help of a small rotary drilling machine, I used several slender metal probes to detect the depths of the ground. Again. They don't understand why this is, isn't it just building the three layers flagship store?

It's not about building skyscrapers or subways.

If there is reporter or the public who can approach the data terminals of these detection instruments, they will find that there is already a detailed 3D three-dimensional model on the computer screen of the folding table, and each pile foundation under this land , Every pipe, every piece of rubble is clearly marked.

This kind of very advanced and rapid geological exploration method is very boring to the people who do not understand the inside story.

So much so that two-thirds of the onlookers were scattered around two hours later, except for the coffee shop on the opposite street.

They didn't wait in vain. They didn't have a cup of coffee. They expected the big scene to finally appear.

The on-site staff opened the first Benz Heavy Truck container and installed a sloping track on the container. Then, in the eyes of many people standing up and looking forward to it, a wheeled, some construction machinery like Colossus Type I roared down from the container.

The first sight of this mechanical car just showed up, and many onlookers raised the cell phone and kept taking pictures of it.

It is not Colossus Type I, Colossus Type I also has a small amount in Europe. At the same time, in Germany, which is called the kingdom of machinery, Colossus Type I, a construction machinery with a dual-arm structure, will not arouse too much attention from the public.

It is Colossus Type II designed and produced by Monster industry specifically for the construction of the energy service center.

The construction of the energy service center has now reached the fourth phase, and there are more than 2,000 energy service centers across the country. In order to be able to build this unified Standard building more quickly across the country, the monsters are considering the limitation that Colossus Type I is too large and not suitable for indoor construction.

The size of the Colossus Type I is reduced, and the fuel generator hybrid is changed to pure electric, and two additional sets of mechanical arms are added.

This is a Crab-Type high-tech machine with four robotic arms...

The traditional Colossus Type I is equipped with a diesel generator set with a dead weight of close to two tons, an immense fuel tank, and a removable tool workbench at the rear. Now these components do not exist on Colossus Type II. It is mainly constructed indoors and relies on wired cables for power supply.

Two additional robotic arms are added to the rear workbench. This is technically easier than making a Colossus Type I.

Of course, the difficulty of its operation has also greatly increased, requiring two operators to remotely operate it together. Those operators responsible for the construction of the energy service center have been practicing for half a month before they ran into each other until they could enter the construction site.

It's not like an excavator. People who can drive up can learn the basic operations in less than half an hour, and the rest is to exercise slowly.

At the same time, this kind of machinery specially prepared for the Monster Industrial Construction Department and integrated intelligent construction programming does not have the premise of selling well in the construction market. When building an energy service center, most of the Colossus Type II is also constructed indoors, so few people outside have seen it, let alone Europe, which is thousands of miles away.

No matter who it is, the first time he sees this guy, he will be turned over by its peculiar appearance.

Especially the two operators who have reached the point where practice makes perfect, they easily operate the Colossus Type II down to the construction site, and unfold its four robotic arms that are more flexible than the crab pliers. When they stretch their teeth and claws in mid-air, they originally felt boring and boring. The crowd was even more excited.

One by one, they can't wait to put cell phone on the glass, taking pictures but turning them into video.

Crab-Type's Colossus Type II was used to clean up the construction site. Four different tools were installed on the terminals of its four robotic arms. There are breakers, hydraulic shears, flat shovel heads, and rammers that can reciprocate. Connected to the power source, its four robotic arms swing back and forth on the construction site covered with dirt and concrete fragments,

For a time, the dust on the thousands of square meters of construction site roared like thunder.

Outside the construction site, two urban sanitation vehicles are parked here. When the staff turned on the water mist cannon to suppress the dust, they also opened their mouths like the water outlet of the fog cannon.

The charm of complex machinery is often more attractive than celebrity.

When someone saw an excavator loaded with a hammer for the first time when they were young, they could stand by and watch the whole morning when the building was demolished by "Dong ~ Dong ~ Dong ~". It was the first time someone saw all kinds of peculiar large-scale machinery in the mining area, and they ran all over the mining area with relish.

Now these Germans are watching Colossus Type II with this mentality. Bored people are gathering more and more~ IndoMTL.com~ Some of them drink coffee, some stom their feet in the cold wind, but their sight is always on. On the construction site, Colossus Type II waving the robotic arm constantly.

It seems that ten excavators are in front of it, and it is not as efficient.

The swing speed of its mechanical arm is as flexible as the construction site worker. In less than an hour, thousands of square meters of construction site has become a flat and neat open space.

The soil has been hit by a pneumatic rammer with an instantaneous impact force of ten tons, and the hammer is like a brick floor.

The concrete pile foundation exposed to the ground was also severely trimmed by Colossus Type II. Now it is on the same level as the hard land.

It's Europe local time at three o'clock in the afternoon, and there are still one day and sixteen hours before the launch of the second generation Illusory Crystal cell phone of Monster industry.

Now, the floors of the opposite Friedrichstraße are crowded with people. At this moment, I don't know how many cameras are aimed at this piece of land.

The Monster industry took an incredible one hour to level the open space. Although the old pile foundations were not removed after being repaired, their existence happened to provide a solid support platform for the new flagship store to be built.

The people think so, but the Monster industry did not.

Another machine device was driven out of the container by the staff.

This is a device machine that looks a bit like a water tanker, but is much smaller. It only has a body supporting the tank and no cab.

The staff from China calmly adjusted the device, and then the Colossus Type II of the Crab-Type also ran over to join in the fun. It fixed a hose on the device and then held it halfway in the air.

When the automatic valve is turned on, a stream of milk-white, some cream-like semi-solid liquid, is sprayed out of the hose and falls freely onto the level ground. 8) For more wonderful novels, welcome to everyone's reading academy


Leave a Reply