Rising: Ten Thousand Years Chapter 487: : Expensive


Laoshan.

"Come on."

"I said one, two, three, let's carry it."

"One two three, hey!"

At the gate of Laoshan County, chanting chant, a group of shirtless men suddenly put a steel rail on their shoulders, and carried them towards the direction of Dafengtai.

The people were puzzled.

"What are they doing?"

"I don't know."

"I heard that Dafengtai is going to build a station."

"Station? What station? Bus station? It's better to have a bus station, so you don't need to spend a high price to hitchhike."

"But what kind of car is going to run on this track? This is the track, right? What kind of car can run on that track?"

"Trains. I haven't heard of them. I already know that this batch is all train tracks produced by the new steel factory in Qingdao County. They are all made of manganese steel. Very powerful."

"Train? A fire-breathing car? What kind of car is that?"

"Go, follow and have a look."

“…”

Dafengtai, a temporary shed, Li Zhen and others have already gathered here.

Looking at the workers working in full swing, one can't help being impassioned.

A section starts from Dafengtai and ends in the wilderness of Licang County, where construction sites take root everywhere. Workers continue to follow the lines of white lime and follow the instructions of professional surveyors. Dig all the roads into a ravine and bury the 'road foundation' in it

Then the rails were lifted, and the rails were connected to the underground road foundation with screws and buckles.

Many workers were in full swing, and the progress of the project was very fast, digging trenches and burying rails at the same time. Then steel beams are used to connect the left and right rails.

Very strong.

In the past month, the more than ten kilometers long railway track from Laoshan County to Licang County has basically been pre-buried.

As the last section of rail was lifted, it was connected to the last section of Dafengtai. The whole section of the railroad track is pre-buried.

'Boom boom boom'

Large steam cars began to drive continuously. Each car is filled with a car full of shaken gravel and sandy soil with excellent water permeability.

Li Zhen turned around and asked: "It's about to be watered. Is the locomotive ready?"

Fang Hanxian and others stood aside and chatted: "It's done. It's made in the factory in Qingdao County, and it's being shipped here now."

"The locomotive of the experimental railroad track does not need to be very precise. But from now on, the design of the locomotive can be put on the schedule. It is already October, and the time seems to be insufficient. I urge all institutions to do so. Speed ​​up the process. Of course, while speeding up the process, the quality must also be guaranteed.”

"I know Master Li."

Liu Jinghong said: "Master Li, the Peng-style test flight is also today. Will you go to the airport later?"

"Let's go there. Peng style is very important, but you can't be careless."

After Li Zhen finished speaking, he turned around and asked: "Jia Liping, how is the progress of the airport? Has it started to be built?"

"Master Li, you said before that you want to build 30 airports across the country. But Du Taiping said that today he will send people to watch the Peng-style test flight. If the Peng-style is successful, Du Taiping wants to add 20 more."

Li Zhen frowned: "Fifty airports are to be built? The airports are now for foreign countries to see, and they can't eat too much. Thirty is enough. If there are fifty, the progress of the project will definitely not keep up."

"I can keep up. The Kyushu Party has made up their minds, and they must build this transportation facility. They promised that they will build airports in 50 counties and counties across the country before March 20th. Perfect."

Li Zhen was silent for a while: "I don't care how many airport plans they want to add. But the 30 I mentioned must not be lost, and the 30 airports I mentioned must be built first. Other airports , after April, he can repair as much as he likes."

"I will report to Emperor Du."

Li Zhen turned around and asked Liu Jinghong: "Is the Peng style okay?"

With a confident smile on his face, Liu Jinghong patted his chest: "I promise to complete the mission. Although the Peng-style has not been tested for a long time, it has been in the ground test for a long time in the courtyard. All the theoretical data exceed Standard, in the actual flight, it will definitely be able to complete the task.”

"Be sure to be steady. Peng style is a long-distance flight."

"Master Li, don't worry, we have built ten Peng-styles in total. The technology is very mature, and the specifications of the ten Peng-styles are exactly the same. We have tested all ten, and the power is similar. This shows that I The casting skills of New Kyushu have been improved. After the successful test flight today, it can be put into mass production immediately."

Li Zhen nodded: "I believe in the Academy of Aviation. After mass production, you must fly every day. Long-distance flights cannot be sloppy, unlike the Grasshopper. You must learn lessons and accumulate flying experience from many flights. Peng The type of test flight is not once today, but one month after today, it will fly non-stop for a month. Only in this way can it find the slightest drawbacks and make improvements.”

"I understand Master Li."

“…”

"Wooooohoo"

A large steam vehicle, towing a cart, came to Dafengtai.

The locomotive is pulled and planted on the cart, but now it is covered with canvas, and many people point and point along the way. To be honest, the reason why people are curious about what is in the canvas is not because of the items in the canvas itself. But no one has ever seen such a big steam car.

It must be extraordinary to pull such a big car.

This large-scale steam car is produced by Xingtu Company, and it is specially used to carry a car like ~IndoMTL.com~, and it can load up to 15 tons at a time.

And this locomotive is obviously not light. Although it is only a locomotive used to test the rails, it is also a locomotive.

When we arrived at Dafengtai, hundreds of workers rushed over in a hurry.

The canvas of the 'crash la la' was untied.

A **** guy appeared in front of everyone.

"Wow!"

"Such a big car?"

"Why is it an iron wheel? Why does the iron wheel run on the ground? People sitting on it will be shaken to death?"

"It's so different from other cars, I can't even imagine this kind of car. But it has a lot of crankshafts connected to the wheels, which looks somewhat similar to the power transmission rods of old-fashioned steam engines. Just, why is it What about exposed outside?"

"This is a steam car."

"My God, how much coal does a big guy like this eat in a day?"

“…”

Li Zhen and others also walked over to watch, and they had to say that the test product was the test product. This big guy looks extremely fierce, but his craftsmanship is very sloppy. It's just based on that principle.

Without a cover, the steam oven is completely exposed, just a platform with wheels underneath. The front is a windshield and protection device of steel plate, and some anti-collision devices have been added.

Li Zhen asked quietly: "How much does this cost?"

Jia Liping said softly: "The cost price of this naked car head is one million gold coupons."

Li Zhen was speechless.

Download the latest txt e-book of this book, please click:

Reading this book on mobile phone:

Publish a book review:

For the convenience of reading next time, you can click "Favorite" below to record this (Chapter 487: Expensive) reading record, and you can see it next time you open the bookshelf! Please recommend this book to your friends (QQ, blog, WeChat, etc.), thank you for your support! !


Leave a Reply